Page 16 - ETC Presentation Sep 2016
P. 16

Current Results
At one of our current project locations, more than 20,000 tons of hydrocarbon impacted soil was treated to below B.C. CSR Wildland Standards.
All post-treatment samples analyzed were below these standards for each sampling event during the entire project.
16


































































































   14   15   16   17   18