Page 111 - 2016 Budget, Bond and Innovation Recommendations
P. 111
Campus Middle School
4785 South Dayton Street
Greenwood Village, Colorado 80111
Year Opened 1971
Current Square Footage 175,743
Site Acreage (included in CCHS) 87.22
campus.cherrycreekschools.org
Proposed Investment 2016 Proposed Improvements
$750,000 Innovation
Asphalt and concrete work; fire protection system, mechanical system, and
$2,441,170
plumbing upgrades; roof replacement; track resurfacing; traffic redesign
Bond Year Facility Improvement History
Classroom, media area, cafeteria and gymnasium addition; technology lab
1990
and administrative area renovation
1999 Building renovation and addition
2003 Mechanical controls and boiler replacement
Front entry, science labs, HVAC system, and music room renovations;
lighting system, electrical system, technology infrastructure,
2008 door/hardware, plumbing, and structural upgrades; storage area additions;
carpet/flooring, back-up generator, sewage ejection system, and
emergency lighting replacements
Security camera and DVR to digital IP system, exterior lighting, elevator,
2012
main gymnasium, locker room and office upgrades; hallway floor repairs
109

