Page 115 - 2016 Budget, Bond and Innovation Recommendations
P. 115
Horizon Community Middle School
3981 South Reservoir Road
Aurora, Colorado 80013
Year Opened 1982
Current Square Footage 168,500
Site Acreage 27.08
horizon.cherrycreekschools.org
Proposed Investment 2016 Proposed Improvements
$ 750,000 Innovation
Breezeway renovation; asphalt and concrete work; windows/caulking,
$1,302,000 electrical system, mechanical system, and plumbing upgrades; track
resurfacing
Bond Year Facility Improvement History
1990 Building addition
1999 HVAC system replacement
2008 Lighting system and temperature control system upgrades; fire alarm system,
sound system and plumbing fixture replacements
Security camera and DVR to digital IP system, fire alarm notification system,
PA system, elevator, exterior lighting, and plumbing upgrades; power and data
(in former open classroom area), and carpet (in hallway, media center and all
2012 classrooms) installation; bridge concrete and metal, all single pane windows,
door hardware/keying, roof, and horizontal ceiling grid replacements;
restroom floor repairs; auxiliary gym floor replaced with wood; interior
painting
113