Page 123 - 2016 Budget, Bond and Innovation Recommendations
P. 123

Cherry Creek High School
            9300 East Union Avenue

            Greenwood Village, Colorado 80111

            Year Opened                               1953
            Current Square Footage              471,632
            Site Acreage                                87.22

            cherrycreek.cherrycreekschools.org




























           Proposed Investment                     2016 Proposed Improvements
                                   Asphalt and concrete work; door/hardware, electrical system, fire
                $16,312,751        protection system, mechanical system, and plumbing upgrades; roof
                                   replacement; traffic redesign; track and tennis court resurfacing
                 Bond Year                          Facility Improvement History
                    1995           Building addition and renovation
                                   Fine Arts building, physical education multi-use area, autism room, and chemistry
                    2003
                                   lab additions
                                   Lighting system, theatre fire suppression system, minor plumbing upgrades;
                                   heating water boiler, plumbing fixtures, swimming pool circulation system, boiler
                    2008
                                   system piping, north gymnasium HVAC equipment, public address system,
                                   emergency generator, telephone room air conditioner replacements
                                   Swimming pool, roof, locker, flooring with asbestos involvement, north
                                   gymnasium bleachers, window and frame, ceiling tile, hollow metal store front,
                                   restroom flooring, door hardware/keying, theatre seating, swimming pool
                                   equipment, mechanical and plumbing equipment, and caulking replacements;
                    2012
                                   gymnasium floor sanded; interior and exterior painting; STEM facility, interior and
                                   exterior lighting, fire alarm notification system, main switchboard, security
                                   camera and DVR to digital IP system, service conductor distribution, and dimming
                                   system upgrades