Smoky Hill High School

                       16100 East Smoky Hill Road
                       Aurora, Colorado 80015

                       Year Opened                              1975
                       Current Square Footage              373,536

                       Site Acreage                            81.76

                       smokyhill.cherrycreekschools.org





























                       Proposed Investment                        2016 Proposed Improvements
                                              Cafeteria renovation; concrete work; fire protection system,
                            $1,592,150        mechanical system, and plumbing upgrades; track and tennis court
                                              resurfacing
                            Bond Year                         Facility Improvement History
                               1999           Auditorium renovation; gym floor replacement
                               2003           HVAC system replacement
                                              Athletic area remodeling; restroom, floor covering, door/door hardware, fire
                                              alarm system, and fire suppression system upgrades; swimming pool, partial
                               2008           window, elevator, lighting, electrical distribution systems, back-up
                                              generator, heating water boiler, chilled water cooling system, plumbing
                                              fixture and sewage ejector pump replacements
                                              fixtures and sewage ejector pump replacements, lockers refurbished
                                              Security camera and DVR to digital IP system, STEM facility, elevator,
                                              dimming system, exterior lighting, back-up generator, auditorium sound,
                                              mechanical systems, and deluge system upgrades; skylight and frames,
                               2012           theatre seating, roof, cafeteria windows/frames, door hardware/keying,
                                              and locker replacements; classroom carpet installation; asphalt overlay
                                              installation in south parking lot