Page 431 - 2021 Catalog
P. 431

         This plumbing schematic is the same for all electronic controls, monitors or standard
3 way electric.
Plumbing in this manner allows pump to achieve full specifications for optimum sprayer control.
Recommendations for High Output Plumbing on Full Size Sprayers:
1 Poly Tank prevents rust and has a long field life
2 Large Valve, ball type minimum 1 1/4” to allow
for flow of 1 1/2” hose size
3 Minimum 1 1/2” Suction Type Hose
4 Large Tee to allow full flow
5 Large, Suction Type Hose
6 Full Flow Valve, 3-Way Poly
7 High Output Series Pump with 1 1/2” input and
1 1/4” output, min.
8 Minimum, 1 1/4” 200# EPDM type pressure
hose
9 3 Way Valve
10 Pressure Type EPDM Hose
11 Poly Tee Fitting
12 1 1/4” Throttle (Gate) Valve
13 1 1/4’ Poly Tee Fitting
14 Electronic Pressure Valve (3/4” min.)
15 200# EPDM Pressure Hose 3/4”
16 200# EPDM Pressure Hose 3/4”
17
PLUMBING SCHEMATICS 21
431 25
  PlumbingSchematics Basic Trailer Plumbing
1 20
19
 18
2
24
  26 3 12
 13 11 9 14
 15 4 8
  22
65
7
23
 Grimes, IA 800-351-1587 •
Gardner, KS 877-829-8502 • Brimfield, IL 855-778-8500
431
17 18 19
20 21 22
23 24 25 26
Valve for Agitation
Agitators, twin with T
Boom Valves, for high flow applications, Electronic ball valves should be used Individual Boom Line Strainers
Minimum 3/4” 200# EPDM Pressure Hose Flush tank plumbed back to suction side of pump to allow for tank thru nozzle rinse out Suction Type Hose
Minimum 3/4” 200# EPDM Pressure Hose Spinner Nozzle in Tank for Complete Rinse Flow Meter in Monitor Applications. Flow meters are usually rated to maximum. Pressure loss occures through undersize flow meters, requiring more pump flow & pressure
        PLUMBING SCHEMATICS
UT-250 T-Bolt Clamp 12 *Pumps not listed; available with Pacer P/N PAC5HP2H-GX or Hypro 1542P-65SP
855-778-8500














































   429   430   431   432   433