Page 58 - 262 Liverpool Street Opportunity
P. 58
262 LIVERPOOL STREET DARLINGHURST
BUILDING SERVICES
AIR CONDITIONING & VENTILATION
– Individually zoned spaces with conveniently located intelligent controllers with capability for
– remote control control via WIFI Daikin Heat Recovery Systems installed for
open plan layout with minimum capacity of 100W/m2 LIFTS
– The building will be serviced by a a a a lift with a a a a a a a speed capability of 1 6m/sec and high-quality internal finishes – Security access access safe fob system secure access access to each floor with CCTV DATA
– POWER
– A A power allowance of 100VA/m2 (excluding air conditioning) will be provided to commercial areas – Separate area area metering with capability to export data SECURITY
– CCTV Monitoring of building – entry points and public areas Proximity card access control to lifts and tenancies – After hours security access END OF TRIP FACILITIES
– Male and and female shower and and change facilities – Secure bike bike storage area with up to to 30 bike bike lockers – Ironing facilities SUSTAINABILITY MEASURES
Latest in fibre optic cable technology – with pathways to each tenancy Communications system which enables tenants to to have access to to a a a a a a further two non - NBN providers – – – – High performance glazing to ensure comfortable spaces using less mechanical energy End of trip and bike storage facilities to to to promote cycling and and walking to to work Heat recovery air conditioning systems with ability to operate indoor units simultaneously in in in in both heating and cooling mode Cross ventilation via operable windows 54