Page 20 - ImmoCem In Mine Tailings Appplications - Technical Assessment
P. 20

    HYDRAULIC BACKFILL
RHEOLOGY IMPROMENT AND TAILING DENSITY INCREASE
Tailing reuse:
Pilot field projects were carried out in the hydraulic backfill plant, by using ImmoCem. It was possible to increase the pumping of tailings from 55% solid to 65%, maintaining the flow and discharge pressure of the pump at normal conditions.
The use of IMMOCEM reduced the viscosity of the tailings, improving the performance of the pumping system with a higher percentage of solids in the tailings.
CALCULATION OF THE INCREASED FLOW OF THE TAILING
       MARS PUMP
CYCLON TAILING
OPERA TIONAL CONDITION
FLO W (m3/Hr)
PREASSURE (B AR)
DENSITY (gr/L)
SOLIDS (%)
T AILING ( TN/Hr)
T AILING (TN/DA Y)
ACTUAL
80
32
1600
55
70. 4
1690
WITH IMMOCEM
80
32
1800
65
93. 6
2246
           INCREASE OF MASS FLOW 23.2 556
     