• Weather expectations during construction of the pavement is 15oC and dry conditions;
• Optimal moisture content for compaction is assumed.
• Required construction equipment is available.
• In-situ material is used (sand or clay).
• Costs for the different materials are location and project specific.
• The required doses of RoadCem are dependent on the soil type and are taken into account. Designs with clay soils assume a value of 3.000 MPa elastic modulus for the RoadCem stabilized layers a the value for viscosity 0,2. For sandy soils the appropriate values assumed are 8.000 MPa for elastic modulus 0.2 for the viscosity.