5. Heavy duty pavements
GENERAL
In harbours and harbour terminal large wheel loads can occur by the heavy lifting equipment typically used in these facilities. Different pavement structure is therefore necessary to support these loads.
For these pavements mostly a sand cement stabilization foundation is used. In the example that is prescribed in this chapter there is give a traditional construction that is used in the harbor of Rotterdam. Next to this traditional construction a similar construction with RoadCem is calculated.
DESIGN CRITERIA.
For the design criteria, the same criteria are applicable for the harbor except for the wheel load and the soil type is well graded sand.
The wheel load and the frequents of a typical harbor terminal is given in table B.6.1
Table B.6.1 Wheel load and frequency during the life span of 20 years.
    Wheel load
kN
   Ni
  Wheel load
kN
    Ni
  275
  444
  195
  10667
  270
  444
  190
  10222
  265
  444
  185
  10667
  260
   1333
   180
   14222
  255
 0
 175
 10222
  250
  6667
  170
  9778
  245
  10667
  165
  8000
  240
  22222
  160
  7556
  235
  36000
  155
  4444
  230
  44000
  150
  4889
  225
  31556
  145
  4444
  220
  28000
  140
  97778
  215
  22667
  135
  0
  210
   22222
   130
   0
  205
 12444
 125
 0
  200
   12444
       The actual designs were verified using flexible pavement design software package BISAR.