Page 234 - RoadCem Manual - PCT BV
P. 234
5. Heavy duty pavements
GENERAL
In harbours and harbour terminal large wheel loads can occur by the heavy lifting equipment typically used in these facilities. Different pavement structure is therefore necessary to support these loads.
For these pavements mostly a sand cement stabilization foundation is used. In the example that is prescribed in this chapter there is give a traditional construction that is used in the harbor of Rotterdam. Next to this traditional construction a similar construction with RoadCem is calculated.
DESIGN CRITERIA.
For the design criteria, the same criteria are applicable for the harbor except for the wheel load and the soil type is well graded sand.
The wheel load and the frequents of a typical harbor terminal is given in table B.6.1
Table B.6.1 Wheel load and frequency during the life span of 20 years.
Wheel load
kN
Ni
Wheel load
kN
Ni
275
444
195
10667
270
444
190
10222
265
444
185
10667
260
1333
180
14222
255
0
175
10222
250
6667
170
9778
245
10667
165
8000
240
22222
160
7556
235
36000
155
4444
230
44000
150
4889
225
31556
145
4444
220
28000
140
97778
215
22667
135
0
210
22222
130
0
205
12444
125
0
200
12444
The actual designs were verified using flexible pavement design software package BISAR.