Page 135 - DOWNS JUNIOR LEAD TEAM PART 1 SUMMARY FLIPBOOK_Neat
P. 135
Pathway to Independence
Don’t leave children dependent on scaffolds for too long – plan a pathway
to independence.
1. Plan out the steps to independence with the child – the Dopamine Dots (see toolkit).
2. Work out the scaffolds needed at each stage.
3. Make sure the child and all adults are clear on the end goal – from the start.