Page 117 - Critical Control flipbook_Neat
P. 117

Emergency Response

                                                    Failure










           1     What is the name of the      2    What are its specific objectives related to the Priority Unwanted
                 critical control for Emergency
                                                   Event (PUE)?
                 Response Failure?
          Emergency drills & after action reviews  Emergency Response teams and third party resources perform drills and after action
                                             reviews to ensure efficient response in case of a real emergency


           3     What are the critical        4     What are the activities      5     What can be sampled from
                                                                                       the set of activities for
                                                    within the management
                 control performance
                 requirements to meet the           systems that support               verification, providing a
                 objectives?                        having the critical control        clear image of the critical
                                                    able to do what is required?       control status?
          The minimum number of drills specified   The ERP documents the type and   Documentation of previous year’s drills
          in the Emergency Response Plan are   number of drills to be performed   and after action reviews
          performed annually                 annually at each site

          Each drill is assessed using an after action   After action review results are   Completion of improvement actions from
          review process to generate and complete   systematically documented after   after action reviews
          improvement actions                each drill identifying opportunities for
                                             improvement and follow-up actions


           6     What is the target performance for critical    7    What is the critical control performance
                                                                     trigger for shutdown, critical control review or
                 control?
                                                                     investigation?
          Site teams, internal resources, and third party resources perform   Emergency response failing to achieve the expected
          required drills and use after action reviews to create and   performance during a drill or a real emergency
          complete improvement actions






































          Creation date: 01/2022 • The latest and only controlled version of this document is available on the HSE intranet.
          © 2022 Holcim - For internal use only
   112   113   114   115   116   117   118   119   120   121   122