Liquid Fuel Fire











           1    What is the name of the       2    What are its specific objectives related to the Priority Unwanted
                                                   Event (PUE)?
                critical control for Liquid
                Fuel Fire?
          Leak-Free System                   Prevent corrosion, erosion and pinhole leaks by selecting compatible material for
                                             pipework, flexible hose, valves, flanges/gasket/unions, pump and vessels that minimises
                                             the likelihood of failure


           3    What are the critical         4    What are the activities       5    What can be sampled from
                                                   within the management
                control performance
                                                                                      the set of activities for
                requirements to meet the           systems that support               verification, providing a
                objectives?                        having the critical control        clear image of the critical
                                                   able to do what is required?       control status?

          Appropriate installation methodology   Approved piping and vessel specification  Field verification of installation against
          used (e.g. flanged, welded, screwed,   Material specification available   the piping specification
          socket fusion, butt fusion welded, solvent   in Computerized Maintenance   Mechanical fitter aware of material
          cement, etc.) with the specified torque to   Management System (CMMS) for parts   specification
          give leak free service             and spares
                                             Written installation methodology

          Adequate pressure rating, testing and   Approved piping and vessel specification  100% completion rate of pressure testing
          specification of materials         Material specification available in CMMS
          (e.g. PN16, hydrostatic test, pneumatic   for parts and spares
          testing, etc)
                                             Written testing methodology
          Adequate corrosion, erosion allowance   Approved piping and vessel specification  Specified corrosion and erosion
          and thickness of materials         Material specification available in CMMS   allowance
          Ensure corrosion under insulation is   for parts and spares
          addressed, and inspected

          Selection of material compatible    Approved piping and vessel specification  Pipework and other materials
          with the fuel and service          Material specification available in CMMS for   compliance to piping specification
          (e.g. stainless steel, alloys, PTFE, etc)  parts and spares


           6    What is the target performance for critical     7    What is the critical control performance
                                                                     trigger for shutdown, critical control review or
                control?
                                                                     investigation?
          A written piping specification available with material selection,   Incompatible material selection leading to frequent (more than
          thickness and pressure allowance, testing and construction   1 per month) minor leaks (pump seal, gasket, pinhole) occurs
          methodology. Repairs and maintenance carried out in accord-  Unauthorised modification (material selection, construction
          ance with the piping standard (CMMS)                 methodology) leading to a loss of containment incident


















          Creation date: 01/2021 • The latest and only controlled version of this document is available on the HSE intranet.
          © 2021 Holcim - For internal use only
   52   53   54   55   56   57   58   59   60   61   62