Page 71 - Critical Control flipbook_Neat
P. 71

Mobile Equipment

                                                   Incident










           1    What is the name of the       2    What are its specific objectives related to the Priority Unwanted
                critical control for Mobile
                                                   Event (PUE)?
                Equipment Incident?
          Zone Access Control                Vehicles entering heavy mobile equipment areas communicate and only enter when
                                             cleared by heavy mobile operators


           3    What are the critical         4    What are the activities       5    What can be sampled from
                control performance
                                                   within the management
                                                                                      the set of activities for
                requirements to meet the           systems that support               verification, providing a
                objectives?                        having the critical control        clear image of the critical
                                                   able to do what is required?       control status?
          Two way positive communication     Set up a process for two way positive   Review process and verify it’s followed
          ensuring messages are understood   communication and ensure workers are   on site
          between sender and receiver (light ME   trained to use this process
          and heavy ME)

          Hold points are set up for light ME to not   Assess hazards of light ME needs to   Review identified hold points and verify
          pass before obtaining permission from   access areas with heavy ME movement   the right place and information given
          the appropriate heavy ME           and set up hold points at entry routes  on site

          Mobile equipment is fitted with two-way   Identify mobile equipment needs for   Review identified radio channels and test
          communication devices using the same   communication devices and install the   message going through those channels
          channels                           necessary
                                             Define channels to be used on site


           6    What is the target performance for critical     7    What is the critical control performance
                                                                     trigger for shutdown, critical control review or
                control?
                                                                     investigation?

          100% of identified mobile equipment are equipped with   Vehicle entering the working zone of heavy mobile equipment
          communication devices and their operators are trained and   without permission of heavy mobile equipment.
          follow two-way positive communication protocols