Page 23 - Aviation Brochure
P. 23
MRO
GE Aircraft Engines Maintenance
Hangar
highlights
◆ 174,000 SF
◆ Hangar, shop, and office facility serve as
a home for GEAE’s Flight Test Operation
flying test bed, a Boeing 747 aircraft
used for in-flight engine testing
◆ 80,000 SF hangar area has stepped
framing with 86’ and 55’ clear
height with a pocket tail door
◆ Hybrid pre-engineered metal building provides
hangar clear dimensions of 265’ wide by 303’
deep with an 87’ clear height at the tail section
services
◆ Complete A/E design
◆ Construction project management
SOUTHERN CALIFORNIA LOGISTICS AIRPORT, CA
www.haskell.com/markets/aviation-aerospace | 21