Page 54 - SALIK PR REPORT JANUARY 2024
P. 54

RTA adds Salik toll gate on Business


               Bay Crossing, operations to start in


               November 2024

               19 Jan, 2024































               Dubai’s Roads and Transport Authority (RTA) today announced the introduction of a new toll gate
               (Salik) at the Business Bay Crossing. The move is aligned with the RTA’s comprehensive strategic
               plan to develop and integrate road networks, public transport routes and services and enhance
               technical  road  and  transport  systems.  The  initiative  also  reflects  the  RTA’s  commitment  to
               implementing policies aimed at encouraging public transport usage and reducing dependence on
               private vehicles.
               The RTA also announced the installation of the Al Safa South Toll Gate on Sheikh Zayed Road,
               between Al Meydan and Umm Al Sheif Streets, for operational and organisational purposes. A
               single tariff will be required when crossing between the two Safa Gates (north and south) within a
               one-hour window.
               These measures  are part of the RTA’s efforts to  streamline traffic flows on Dubai's  roads by
               rerouting traffic to alternative traffic corridors such as Sheikh Mohammed bin Zayed Road, Dubai
               - Al Ain Road, Ras Al Khor  Road , and Al Manama Street. They also encourage the use of
               alternative  Creek  crossings  such  as  the  Infinity  Bridge  and  Al  Shindagha  Tunnel,  besides
               encouraging residents and visitors to opt for less crowded traffic routes.
               As per RTA’s plan, the two gates are set to be fully operational by November 2024, in concurrence
               with the completion of the Al Khail Road Improvement Project. The project encompasses the
               construction of five intersections and braided ramps along with the introduction of rapid traffic
               solutions  at  two  key  points  along  Al  Khail  Road.  It  also  includes  enhancing  the  surface
               intersections of First Al Khail Road with Al Meydan and Al Zumurrud Streets.
               Transport policies



               https://mediaoffice.ae/en/news/2024/January/19-01/new-Salik-gates
   49   50   51   52   53   54   55   56   57   58   59