Page 90 - SALIK PR REPORT JANUARY 2024
P. 90
1/22/24, 1:50 PM RTA to Add Salik Toll Gate on Business Bay Crossing Starting November
added Al Tayer.
Advanced Infrastructure
“RTA has completed a wide range of mega projects
totalling over AED146 billion in value. These projects are
highlighted by the Dubai Metro, the world's longest
driverless metro network extending 90 km, which has
transported over two billion riders from the start of
operation on 9/9/2009 up to the end of last year.
“Projects also included constructing the 11 km-long
Dubai Tram, extending the bus routes from 2,095 km to
3,967 km (in both directions) from 2006 to 2023, and
deploying a modern fleet of public buses comprising
1,400 buses compatible with the European specifications
for low carbon emissions "Euro 6". RTA is also operating
an integrated marine transport network including
traditional abras, Dubai Ferry, and water taxis. It has also
developed an extensive network of roads and bridges
reflected in extending the total length of the network from
8,715 lane-kilometres in 2006 to 18,886 lane-kilometres in
2023. Last year witnessed the opening of several vital
road projects, including Sheikh Zayed bin Hamdan bin
Zayed Al Nahyan Street, Ras Al Khor Road as part of the
Sheikh Rashid bin Saeed Corridor Improvement Project,
https://focus.hidubai.com/rta-adds-salik-toll-gate-on-business-bay-crossing-operations-to-start-in-november-2024/ 5/7