Page 23 - ME FITOUT PR REPORT - May 2025
P. 23

ME FITOUT transforms UAE’s interior contracting landscape with manufacturing facility - Construction Week Online
        technology, sustainability, and craftsmanship converge to meet today’s demand for
        precision, speed, and design excellence. It’s our commitment to shaping the future of fit-
        out solutions in the UAE”


        The manufacturing facility is designed for high-output production and has the capacity to
        simultaneously deliver multiple complex, large-scale projects without compromising on
        quality or customisation. It features a full suite of next-generation European machinery
        to support large-scale and highly customised productions. The facility also utilises
        intelligent recycling systems, material optimisation software, as well as a centralised
        sawdust collection and disposal process, aligning with the UAE environmental standards.

        Sherif Nagy added, “The facility’s advanced setup enhances our operational agility,
        enabling us to maintain consistent quality at scale, adapt seamlessly to evolving project
        requirements, and significantly reduce operational waste, in an increasingly competitive
        market. Additionally, our facility is designed to ensure the safety, comfort and well-being
        of our employees, fostering a secure, supportive, and stress-free environment that
        empowers productivity and innovation.”


















































        Leveraging the combined expertise of highly trained professionals, the plant boasts
        specialised in-house capabilities across joinery, FF&E, upholstery, glass, solid surfaces,
        and metalwork, ensuring consistency and excellence across diverse project aspects.


        Further, the facility is integrated with best-in-class software, ensuring optimised material
        use, enhanced scheduling accuracy, and real-time workflow management for precision-
        driven results that align with the stringent timelines of high-profile developments.



      https://www.constructionweekonline.com/news/me-fitout-new-facility                                         2/3
   18   19   20   21   22   23   24   25   26   27   28