Page 39 - ME FITOUT PR REPORT - May 2025
P. 39

ME FITOUT to transform UAE’s interior contracting landscape with new high-tech manufacturing facility in Dubai - Observer Dubai
        support large-scale and highly customised productions. The facility also utilises intelligent
        recycling systems, material optimisation software, as well as a centralised sawdust

        collection and disposal process, aligning with the UAE environmental standards.


        Sherif Nagy added, “The facility’s advanced setup enhances our operational agility,

        enabling us to maintain consistent quality at scale, adapt seamlessly to evolving project
        requirements, and significantly reduce operational waste, in an increasingly competitive

        market. Additionally, our facility is designed to ensure the safety, comfort and well-being

        of our employees, fostering a secure, supportive, and stress-free environment that
        empowers productivity and innovation.”


        Leveraging the combined expertise of highly trained professionals, the plant boasts

        specialised in-house capabilities across joinery, FF&E, upholstery, glass, solid surfaces,

        and metalwork, ensuring consistency and excellence across diverse project aspects.

















































        Further, the facility is integrated with best-in-class software, ensuring optimised material

        use, enhanced scheduling accuracy, and real-time workflow management for precision-

        driven results that align with the stringent timelines of high-profile developments.







      https://www.observerdubai.com/2025/05/29/me-fitout-to-transform-uaes-interior-contracting-landscape-with-new-high-tech-manufacturing-facility-i…  3/4
   34   35   36   37   38   39   40   41   42   43   44