Page 149 - ENGLISH PR REPORT FEBRUARY 2024_Neat
P. 149
Dubai Municipality has implemented a project to rebuild and rehabilitate the supporting
walls along the Deira side of Dubai Creek, with a total expense of AED 112 million. The
project aims to enhance the effectiveness of the creek’s retaining walls by upgrading the
dock, reconstructing sections that have been damaged and dilapidated over the past 50
years, and preventing potential flooding during harsh weather conditions. This effort
aims to minimize disruptions to commercial traffic caused by flooding or bad weather.
The project is set to be implemented in two phases, with the initial phase involving the
restoration of a 2.1 km stretch along the Deira side of Dubai Creek. The site will be
divided into multiple sections, and each segment will be sequentially patterned to
ensure uninterrupted docking traffic. The second phase will cover a 2.3 km length on
the Bur Dubai side.
Global Reputation
H.E. Dawoud Al Hajri, Director General of Dubai Municipality, stated that the project
highlights Dubai Municipality’s commitment to transforming Dubai into a more attractive
and innovative city by enhancing various elements and services it offers through the
strategic and sustainable development of all coastal facilities and infrastructure in the
Emirate. The goal is to solidify Dubai’s position as a global tourism hub and augment its
economic and commercial prosperity.
Al Hajri said: “The project is set to improve security and safety measures for maritime
traffic and commercial operations within Dubai Creek. As a significant symbol of the
city’s growth, Dubai Creek serves as a vibrant artery at the heart of Dubai. Facilitating
the passage of over 13,000 ships annually, it plays a key role in fostering the economic
and social prosperity of the emirate. Additionally, the creek further supports commercial
dealings with neighboring markets in the region.”
“We have implemented several measures to mitigate the risks posed by climate change
and rising sea levels, closely monitoring changes on both sides of the creek.
Furthermore, we have conducted technical studies to devise construction designs that
can enhance the efficiency of the marine docks on both banks. These designs adhere to
the highest global standards, ensuring the preservation of the supporting walls’ stability
and safeguarding against increased flooding during seasonal weather conditions.” Al
Hajri added.
Comprehensive work
The project's 14-month timeline includes the restoration of the 2.1 km Deira pier, which
involves replacement and the rehabilitation of damaged sections of the concrete wall,
https://mediaoffice.ae/en/news/2024/February/25-02/Dubai-Municipality-initiates-project-to-develop-
Dubai-Creek-pier-and-upgrade-support-walls