Page 164 - ENGLISH PR REPORT FEBRUARY 2024_Neat
P. 164

The project by Dubai Municipality, which costs Dh112 million, is set to be implemented
               in two phases. The initial phase will restore a 2.1km stretch along the Deira side of
               Dubai Creek. The site will be divided into multiple sections, and each segment will be
               sequentially patterned to ensure uninterrupted docking traffic. The second phase will
               cover a 2.3km length on the Bur Dubai side.
               The project will also install 200 anchors along the creek to ensure safe navigation
               services and facilities.


               Artery of Dubai
               A symbol of the city's growth, the Dubai Creek serves as an artery at the heart of Dubai,
               facilitating the passage of over 13,000 ships annually.
               "The project is set to improve security and safety measures for maritime traffic and
               commercial operations within Dubai Creek," said Dawoud Al Hajri, Director General of
               Dubai Municipality. "[The Creek] plays a key role in fostering the economic and social
               prosperity of the emirate. Additionally, the creek further supports commercial dealings
               with neighbouring markets in the region."
               He also stated that the Dubai Municipality is committed to transforming Dubai's coastal
               facilities and infrastructure. The goal is to solidify Dubai's position as a global tourism
               hub and augment its economic and commercial prosperity.
               "We have implemented several measures to mitigate the risks posed by climate change
               and rising sea levels, closely monitoring changes on both sides of the creek," he added.
               "Furthermore, we have conducted technical studies to devise construction designs that
               can enhance the efficiency of the marine docks on both banks. These designs adhere to
               the highest global standards, ensuring the preservation of the supporting walls' stability
               and safeguarding against increased flooding during seasonal weather conditions."


               Comprehensive work
               The project's 14-month timeline includes the restoration of the 2.1 km Deira pier, which
               will involve replacing and repairing damaged sections of the concrete wall, reaching a
               depth of 8 meters and increasing its height to 3 meters.
               These improvements will ensure the safe docking of ships in the area. Dubai Creek is
               one of the most vital historic maritime channels in the Emirate, marking the initiation of
               Dubai's trade interactions with the world over a century ago.
               Despite the extensive development in the emirate, the Creek continues to maintain its
               historical, commercial, and economic importance, along with modern projects prevalent
               in the emirate, in addition to serving as a significant tourist hub for residents, visitors,
               and tourists.









               https://www.khaleejtimes.com/ml/business/infrastructure/dubai-announces-dh112-million-creek-
               restoration-project-to-prevent-potential-flooding
   159   160   161   162   163   164   165   166   167   168   169