Page 62 - SOL Properties PR Report - September 2025
P. 62

Latest News
        inspired luxury living.”



        SOL LUXE offers 288 premium residences in one-, two-, and three-bedroom layouts with studies, catering
        to a variety of lifestyle needs. Levels 1 to 25 of the tower will house 66 expansive Grade A office units with

        a ceiling height of 3.7 meters, offering sweeping views of the Dubai skyline. The ground floor will feature a
        collection of selected F&B retail spaces with 9-metre-high frontages, three-sided visibility, and direct

        access to Sheikh Zayed Road.



        The project integrates elegance, sustainability, and smart technology. It will feature a sculptural bronze-
        and-glass façade with curved glass edges and horizontal bronze bands, giving it a bold and elegant look
        on the Dubai skyline. High-performance glazing, solar-control systems, water-saving technologies, and

        EV-ready infrastructure will help reduce its environmental footprint. AI-powered smart systems will be
        embedded throughout the tower, enhancing comfort and convenience through features such as air-quality

        optimisation, predictive maintenance, and secure visitor management.


        Residents and tenants will enjoy a wide array of lifestyle and wellness amenities. These include an

        infinity-edge pool, kids’ pool, jacuzzi with Burj Khalifa and Burj Al Arab views, indoor-outdoor gym, rooftop
        mini golf, yoga decks, barbecue pavilions, multipurpose halls, and terrace lounges. Families will benefit

        from children’s play areas and landscaped zones, making it a curated world of wellness and leisure.
        Commercial office owners will also have a dedicated floor of similar amenities including a private meeting

        rooms and flexible indoor/outdoor event spaces for social activities



        With its unrivalled location, iconic design, and world-class amenities, SOL LUXE represents a unique
        investment and lifestyle opportunity on Sheikh Zayed Road. Construction on the tower is already
        underway, and the handover is expected in Q4 2028.



        -ends-

































      https://www.arabbnews.com/english/Latest-News.asp?id=18503                                                 2/2
   57   58   59   60   61   62   63   64   65   66   67