Page 417 - SHARJAH AIRPORT PR REPORT - FEBRUARY 2024
P. 417
2/6/24, 10:01 AM Sharjah on the charge... | Times Aerospace
standards. We are optimistic that the addition of more
destinations will provide us with more travel and
logistics opportunities,” he said.
Sharjah Airport will be extended to increase its
capacity from eight to 20m people per year within the
next two years. The new infrastructure, estimated at
roughly US$410m, will provide state-of-the-art
facilities, streamlined check-in and registration
procedures and cutting-edge technologies.
The project involves the construction of a new building
and a terminal for arrivals. The airport’s exterior will
mirror the wing of a plane, resulting in an open book
shape structure. New aircraft hardstands, with 12
remote aircraft hardstand apron pads, will be created
and connected to the existing building, while the roads
leading to the airport will be developed.
The expansion also includes the renovation of the
existing building and construction of a new departures
terminal, two passport control areas to ease
passenger flow, a new VIP lounge and a new ground
support equipment (GSE) vehicle maintenance facility.
Sharjah Airport launched an exciting summer
campaign under the slogan ‘Summer at Sharjah
Airport’, focusing on providing passengers with
https://www.timesaerospace.aero/features/airports/sharjah-on-the-charge 4/6