Page 34 - Sisk Annual Report 2015
P. 34
SISK GROUP - SICON LTD PHARMACEUTICAL
Sisk Pharma Division has delivered over €1.5 billion
in construction over the past 20 years.
For over four decades, John Sisk & Son Teams, to ensure seamless transition
have been leaders in the construction from construction into Qualification.
of Pharmaceutical, Bio-Pharmaceutical, We utilise the most modern techniques for
Medical Device & Research Laboratory the coordination, assembly, storage and
Facilities. We have been successful issue of critical project documentation.
in winning on-going repeat business,
for many of the World’s leading Multi- In addition, we have in-house capabilities
National Companies, some of whom with regards to BIM (Building
we have worked consistently over Information Modelling). Through our
20 years. We deliver projects right dedicated expert teams, we work
through from pre-construction, together with clients, Designers and our
construction through to hook-up, Supply Chain to optimise technology
commissioning and validation. and assist with coordination, decision
These projects have ranged in value making and information handover in
from less than €500,000 to €170m+. a 3-D environment. This is one of the
fundamental tools that we use to deliver
We recognise the need to retain projects using a Lean Construction
specialist skills and have assembled a Approach, lowering costs, reducing
dedicated Pharma Division with people waste and providing value for clients.
who only work in this sector. This broad We engage early with our supply chain
team, which consists of all the key and utilise their specific expertise to
disciplines, brings a wealth of knowledge bring value and efficiency to design
and experience to every project and and the construction methodology.
maximises potential for success. We deliver to tight time frames and
Whether we work as a Main Contractor, have expert planners to plan and
a Management Contractor or a Design report on all phases of a project, both
& Build Contractor, whatever the model, from a milestone perspective and the
we bring a “hands on” approach to the implementation of work face planning.
management of these projects.
A substantial amount of our work
We have developed through the years, is in a live environment. Where the
standard procedures, protocols and maintenance of on-going manufacturing
verification documentation on all aspects operations is critical to project success.
of the delivery which can and has been Utilising our environmental and logistical
leveraged into project validation. procedures, we take an innovative
We provide the necessary expertise approach to ensuring the impact to
to manage the most complex process on-going facility operations is minimised
installations working collaboratively with and appropriately managed.
Client Facility and Quality Management
SISK REVIEW 2015 / 33