Page 158 - January 2022 Issue
P. 158

•  Expectations / Instructions for Local Agents      •  No Crew change planned.
            •  Expectations / Instructions for Cargo Surveyors   •  Crew shore Leave Cancelled.
            Physical measures taken by the vessel to             •  Basic health check of all visitors planned.
            achieve safe interaction with shore personnel        •  Crew health record (daily Twice) maintained.
                                                                 •  Social distance from Visitors will be maintained.
            •  Risk  assessment  done.  Only  emergency  spares   •  Addendum in the Visitor Log pages for COVID-19,
               requirements requested at this port.                health checks to have seamless information of the
            •  Designated  Room  for  Ship-Shore  Interface  on    Visitor.
               main  deck  Stbd  side  (converted  Suez  Canal   •  Regular  Cleaning  of  Designated  spaces  (04
               room).                                              hourly).
              Special arrangement for Gangway security so as     •  Not  allowing  shore  personnel  to  bring  outside
               to achieve NIL Physical Touch with the Visitor.     food.
            •  Disposable Visitor passes were issued.            •  Maintaining Galley Hygiene.
            •  Bio-hazard Bins placed at various locations with   •  Maintaining Clean Garbage area.
               PE bags and cable ties for safe disposal of the Bio   •  Regular Drill & Briefing on COVID-19 to ensure all
               hazard materials.                                   crew members are aware of the latest precautions
            •  Sanitization  station,  Including  Shoe  sanitization   to be taken.
               arrangement @ Gangway.                            Awareness Campaigns
            •  Regular Drill & Briefing on COVID-19 to ensure all
               crew members are aware of the latest precautions   Advisories were issued from time to time to Fleet
               to be taken.                                      and Shore Personnel. Messages from Management
            •  All  Crew  was  distributed  with  required  PPE  &   expressing concern and urging for exercising caution
               same will be done during Interface.               and  hygiene  have  been  sent  across  the  Fleet  and
            •  No provisions/Stores pick up planned.             Shore personnel at intermittent intervals. Handouts
            •  Vessel maintaining sufficient PPE stock for next   giving tips sent to the employees were sent across.
               02 ports of call.                                 Cadets enrolled for the course of Maritime Training


                                                                               The Shipping Corporation of India  131
   153   154   155   156   157   158   159   160   161   162   163