Page 31 - Containerised Data Centres TMDC
P. 31
TAINERISED DATA CENTRES
PUE
Our aim is to be as efficient as IT Equipment Proposed 25kW Per Cabinet
(Desirable)
possible (IRO 1.3)
Equipment Qty Power Total QTY Power Total
• The PUE is dramatically effected by Customer (W) (W)
Equipment (BE)
the IT equipment 1 11750 11750 20 25000 500000
Often customer specified
Proposed 100100
• Efficient equipment specified Equipment (CE) 1 150 150 1 150 150
10 33 330 10 33 330
• Levels to meet customer req’s UPS (@UNITY)
2 460 920 2.5 18600 46500
• 1.1 achieved recently using: Alarm circuit
ACU in free cooling 1400 46980
UPS with unity PF Lighting
LED lighting ACU (Free
Alarm equipment cooling)
Total (NE)
PUE = 1+ CE/BE 1.12 1.09
© Cannon Technologies Ltd (2014) www.cannontech.co.uk
PUE
Our aim is to be as efficient as IT Equipment Proposed 25kW Per Cabinet
(Desirable)
possible (IRO 1.3)
Equipment Qty Power Total QTY Power Total
• The PUE is dramatically effected by Customer (W) (W)
Equipment (BE)
the IT equipment 1 11750 11750 20 25000 500000
Often customer specified
Proposed 100100
• Efficient equipment specified Equipment (CE) 1 150 150 1 150 150
10 33 330 10 33 330
• Levels to meet customer req’s UPS (@UNITY)
2 460 920 2.5 18600 46500
• 1.1 achieved recently using: Alarm circuit
ACU in free cooling 1400 46980
UPS with unity PF Lighting
LED lighting ACU (Free
Alarm equipment cooling)
Total (NE)
PUE = 1+ CE/BE 1.12 1.09
© Cannon Technologies Ltd (2014) www.cannontech.co.uk