Page 8 - ELS_KZJ
P. 8

2. General Performance

          ❖  ACTIVITIES OF THE SHED:
             ⮚  Minor schedules viz. IT, IA, IB, IC1, IC2, and IC-0.

             ⮚  Major schedules viz. TOH & IOH.

             ⮚  TRIP schedules & yard attentions of foreign locos.

             ⮚  Un-schedule repairs of all locos (including Foreign Locos).

             ⮚  Maintaining special featured locomotives having DPWCS,TCAS,RTIS, RMS & CVVRS
                 DPWCS System provided in 20 Locomotives (LOTUS=14 & MEDHA= 02 Locos)
                 TCAS system provided in 20 Locomotives (HBL=06, MEDHA=12 and KERNEX=02

                 Locos)
                 RTIS System provided in 31 WAG-9 Locomotives (BEL=31 Locos)
                 RMS system provided in 08 WAG-9 locomotives(LOTUS=08 Locos)
                 CVVRS system provided in 15 WAG-9 locomotives(KAMNEY Electronics =15 Locos)

          ❖  MILESTONES

             ⮚  Foundation stone of Shed Laid on 18/7/2002

             ⮚  Inspection shed Inaugurated by Hon’ble GM/SCR on 14/10/2004

             ⮚  Member Electrical Inspected shed on 25/11/2004

             ⮚  Commissioning of Heavy Lifting bay on 31/3/2007

             ⮚  Commissioning of ML and LL bays on 01/03/2008

             ⮚  Achieved the zonal best Efficiency shield in 2009-2010

             ⮚  Achieved the zonal best Efficiency shield in 2013-14 (sharing with BZA)

             ⮚  Received First prize of National Energy conservation awards 2016 for conservation
                 of Energy in Railway workshop sector.

             ⮚  ELS/KZJ  achieved  5S  Certificate  and  IMS  Certificates  by  IRCLASS  Systems  and
                 Solutions Pvt. Ltd.

             ⮚  Achieved Energy Management Certificate ENMS ISO 50001:2011 from M/S Bureau
                 Veritas (India) Pvt. ltd.

             ⮚  Achieved Green Co-SILVER certificate from CII-GODREJ GBC
   3   4   5   6   7   8   9   10   11   12   13