3.       Tree  trimming  in  the  89107 Tree trimming
                    mainline and siding.




           4.       Anti  Monkey  climbing  Work  is  in  progress
                    Devices                        for  provision  of anti
                                                   monkey       climbing
                                                   devices.  Total-1500
                                                   Nos  Done- 700




           5        Provision  of  Discs  for  In DKJ yard and ZN
                    prevention  of  Monkey  sections            Insulator
                    menace.                        Discs            were
                                                   provided  to  avert
                                                   CB Trippings due to
                                                   the          Monkey
                                                   menace. Total-1200
                                                   Done-1150
            NICCO Contact wire replacement:


                 Total no          Replaced        2018-      2019-20      2020-21  2021-22  Balanc
            Tension lengths          before         19                                  ( Till       e
                                      2018                                              OCT
                                                                                        31  )
                                                                                          st
             Out of 407 TLs            2 TL         4 TL       41 TL        80 TL      37 TL’s    43 TLs
               identified,           (2.755       (4.049      (53.013       (98.26    (47.387  (in trunk
            197( Identified in       TKMs)         TKMs)       TKMs)        TKM)        TKM)      route)
           trunk route) TLs  to                                                                    to be
              be replaced                                                                        replace
                                                                                                     d
            Aluminium Catenary wire replacement:
           Total TKM      Replaced        2017-    2018-19     2019-     2020-      2021-22        Total
                            before         18                    20        21       ( Till OCT
                            2016-17                                                   31  )
                                                                                         st
            995 TKM       591.13 TKM       75       65.124      31.2       49          17        756.454
              To be                       TKM        TKM        TKM       TKM         (TKM)
           replaced

                            POWER LINE CROSSING DETAILS IN WADI-SC  SECTION


                                                                                            Clearance  from
                     Section Between                                                     OHE to bottom of PL
            Sl.No                             KM.no/ Location         Type of Voltage
                          Stations                                                           Xing conductor
                                                                                              ( in meters)

                                                  10/9-11'                                       14.07
              1          CT-SUH                                           220 KV
                                                  10/10-12'                                       15.1
   16   17   18   19   20   21   22   23   24   25   26