Line Diagram of division indicating Electrified & Non-Electrified Sections
































                                        Fig. Line Diagram of TRD SC Division

           Staff details of TRD SC Division



                                               Total                         Electrified
                    Name  of  the
                    Division          Sanctio    Actual             RKM                 TKM
                                      ns

                          SC            762           622            1190               2955


           * RB letter No: E(MPP)2019/1/12, dated : 30/09/2019.

             CHECK OF EARTHING OF VARIOUS STRUCTURES:


             Earthling  of  OHE  structures,  platform  shelters,  Foot  Over  Bridges  and  Girder

             bridges  are  being  checked  regularly  and  corrective  action  being  taken
             immediately.
             CHECKING OF IMPLANTATIONS:


             Implantations of all the structures are being checked periodically.

           a) Performance Statistics:


           Action plan items for the year 2021-22:


                                                                                      Prog     Balance
             Sl.                                                             Targe
            No.              Item in brief                                      t     ress

                   Elimination of Cross track feeder for the first track by
                   connecting jumper directly from gantry/ mast using
              1    standard out-rigger arrangement (it will reduce two         25       5         20
                   cross feeders if connected to the nearest track OHE)
                    (RB Lt.No.2013/Elec(G) / 1,48 / 1, dated 10.5.2019).
   1   2   3   4   5   6   7   8