Page 3 - vacancy
P. 3
NO. OF ADMINISTRATIVE NO. OF POSTS
SL. DEPART FINAL SANCTION BY
NO MENT SECTION POSTS APPROVAL BY APPROVED GM REMARKS
PROPOSED DRM/SC BY FA&CAO
RDM, BPA
Goods Cabins &
20 OPTG. RDM Bye- pass Balance 16 posts
cabin(3 cabins) 16 16 0
TLPR-RCPM & MLY
21 S&T 57 52 0 With PCPO/SC as on 16.07.2021
-C - CHZ- GT Sec
RGPM-MMZ
(RGPM,RDM With PCPO vide lr.dt.22.02.2017 for obtaining FA&CAO's
22 S&T PPZ,MCI &MMZ) in 23 17 - - concurrence
KZJ-BPQ section
New BG line bt
JPTN to MACU for Proposal with PCPO vide lr dt.21.05.2012. Vide CSTE's
23 S&T the stations 20 20 - - lr.dt.06.07.2012 posts certified are JE/S-1, ESM.III,08,
JPTN,RRPM & Khasali-8,TCM.III-1 Totalling to 18 posts.
MACU
Mattampalli-
Janapahad
(Mattampalli,
Raghapuram,
24 S&T 26 22 - - With PCPO vide lr dt.22.02.2017
Janapahad &
Vishnupuram
(addl)
New BG Non
electrified Single
Line Between
PDPL-NZB (for the
stations Korutla,
Metpally, Mortad
&Armoor). Out of 53 posts - 24 posts i.e SSE-01, ESM-III-07, SSE/T-
New BG Non 01, JE/T-01, TCM.III-05,,Khalasis-09 have been
25 S&T electrified Single 53 53 - - sanctioned, however, as the section is an important
section, the remaining Technical posts i.e SSE/S-02,
Line Between ESM-II-08, JE/T-02, TCM-III-05, Khalasis-10, B/S -01, H/M-
PDPL-NZB (for the 01 may also be got sanctioned please. File with
stations Sr.DPO/SC
Gangadhara,
Lingampet,
Jagityal, Podur
and Mallial
Nukapalli