3.1.2. CROSSOVER CORRECTION:


                     Layout corrections  in ALER, PQL, NSKL,  KZJ, RGP, BN & PGDP yards are
                     completed for 10 nos and all the layouts in the above mentioned yards
                     are  as  per  required  total  lengths.  All  the  points  being  emergency
                     crossovers  at  all  major  yards  safety  has  been  enhanced  by  removing
                     kinky alignments.













                                   20B ALER                                   18A BN














                                      12B PQL                                  20B RGP

               3.1.3.   REMOVAL OF BOTTLE NECKS:
                      Long standing 15 Kmph TSR at BN up loop has been relaxed to 30 Kmph
                      after shifting 18B point by 12.99m and long standing TSR of 8 Kmph in

                      KZJ yard at 112B point has been relaxed to 15Kmph after shifting 112B
                      point by 6.0m.

                                                            Relaxed  Relaxed
                     S No  Section  Location          SR                                  Remarks
                                                                to         on
                                           BN-UP                                     Shifting 18B point by
                       1       SC-KZJ                  15       30
                                           LOOP                                            12.99m
                                                                                    Shifting 112B point by
                       2       SC-KZJ    KZJ YARD      8        15
                                                                                             6m