Page 34 - HSE -Zero is Possible_v1.0
P. 34

Ellinikon RMX Plant
                           Water
           GREECE  Ready-mix  Ultra-compact treatment


                           system for urban areas





                           Opportunity             Results
                           To recycle wastewater   Needed to participate
                           within urban areas.     in the largest urban
                                                   regeneration project in
                           Solution                Europe. Won the approval
                           Design and install an   of authorities with a
                           extremely compact       very compact design
                           wastewater treatment    compared to conventional
      Dimitrios Chanis     system, ideal for       construction methods.
          CEO              congested areas.        •  90% wastewater clean
                                                    for reuse
                                                   •   Dry cake with moisture
                                                    < 15% footprint
                                                   • Total cost ~145,000 CHF




          Diana
      Georgakopoulou
       Environmental
      & Sustainability
      Project Manager





    26
   29   30   31   32   33   34   35   36   37   38   39