Page 34 - HSE -Zero is Possible_v1.0
P. 34
Ellinikon RMX Plant
Water
GREECE Ready-mix Ultra-compact treatment
system for urban areas
Opportunity Results
To recycle wastewater Needed to participate
within urban areas. in the largest urban
regeneration project in
Solution Europe. Won the approval
Design and install an of authorities with a
extremely compact very compact design
wastewater treatment compared to conventional
Dimitrios Chanis system, ideal for construction methods.
CEO congested areas. • 90% wastewater clean
for reuse
• Dry cake with moisture
< 15% footprint
• Total cost ~145,000 CHF
Diana
Georgakopoulou
Environmental
& Sustainability
Project Manager
26