Torres de Alameda
        Best (RMX) place

        to work

        3D printing a safer and                                                                              SPAIN  Ready-mix

        smarter workplace

        Opportunity             Results
        Test concrete 3D printing   •  Better Workplace:
        to build our next-gen RMX   improved comfort,
        plant facilities.        safety, and operational
                                 efficiency
        Solution                •  5.22 tons/year of CO2
        First 3D printed office   emissions avoided
        building in Spain,      •  Solar production
        retrofitting latest      covers 100% of the new
        technologies to reduce   building and 30% of the                                               Ricardo de Pablos
        risks and environmental   plant consumption                                                         CEO
        impact                  •  AI solution deployed in
        •  Designed to improve   partnership with leading
         comfort, safety and     vendors enables a
         workers wellbeing       safer work environment
        •  100% renewable energy   (detection and alert of
         with 12 kWh solar panels  vehicle interactions,
        •  AI enabled cameras    suspended loads, PPE
         idetect and alert workers   issues...)
         of unsafe behaviors                                                                            Mariano García
                                                                                                         Sustainabilty
                                                                                                           Director
        Cost: ~1.75 kCHF/m 2
        Construction time: 90 days