Page 30 - Zero is Possible - Volume 3
P. 30

MOROCCO  Cement  All sites            •  Water risk management                     180,000 m    3
                         Water
                                                                                              water saved
                                                                                              same as 40 olympic
                         Efficiency in every drop
                                                                                              swimming pools

                         Opportunity
                                                  integrated into business
                         Facing increasing water
                         scarcity and drought
                                                  continuity plans
                         challenges, LafargeHolcim
                         Morocco committed to    Cost: 1.9 MCHF
                         ambitious targets for 2024-  Timeline: 3 years (2023-
                         2030 to reduce freshwater   2025)
                         use, boost water recycling,
                         and ensure operational   Results
                         resilience.             •  Cut specific water use by
                                                  31% to 41.31 l/tcem in
                         Solution                 2 years
                         Implemented a holistic   •  Saved 180,000 m³ of
       Khalid Samaka
          CEO            water management plan    water (≈ 40 Olympic
                         across all sites:        pools)
                         •  Smart meters for real-  •  Zero water-related
                          time monitoring and leak   operational disruptions
                          detection              •  Increased team
                         •  7,500 m³ rainwater basins   engagement through
                          for reuse               visible environmental
                         •  Wastewater treatment and   impact
                          recycling systems
                         •  Renovated water networks
     Mohammed Al Fakihi
       Head of HSE        to fix leaks and optimize
                          equipment







    26
   25   26   27   28   29   30   31   32   33   34   35