Page 30 - Zero is Possible - Volume 3
P. 30
MOROCCO Cement All sites • Water risk management 180,000 m 3
Water
water saved
same as 40 olympic
Efficiency in every drop
swimming pools
Opportunity
integrated into business
Facing increasing water
scarcity and drought
continuity plans
challenges, LafargeHolcim
Morocco committed to Cost: 1.9 MCHF
ambitious targets for 2024- Timeline: 3 years (2023-
2030 to reduce freshwater 2025)
use, boost water recycling,
and ensure operational Results
resilience. • Cut specific water use by
31% to 41.31 l/tcem in
Solution 2 years
Implemented a holistic • Saved 180,000 m³ of
Khalid Samaka
CEO water management plan water (≈ 40 Olympic
across all sites: pools)
• Smart meters for real- • Zero water-related
time monitoring and leak operational disruptions
detection • Increased team
• 7,500 m³ rainwater basins engagement through
for reuse visible environmental
• Wastewater treatment and impact
recycling systems
• Renovated water networks
Mohammed Al Fakihi
Head of HSE to fix leaks and optimize
equipment
26

