Page 76 - Zero is Possible - Volume 3
P. 76
Rezina
MOLDOVA Cement response
Emergency
The silent hero:
Tire(d) of fires?
Opportunity Cost: 3 kCHF
Use of used tires required (per foam unit)
specific fire protection Timeline: 1 month
and emergency
preparation. Results
• Drills proved a good
Solution preparation and efficient
• Limited storage capacity dense and stable foam
Stefan Birau • Two independent blanket
CEO storage cells separated • After action reviews
by fire resistant walls enabled improved
• Dedicated track response times
excavator to respond • Better asset protection
• Fire drills performed by
the emergency response
team using a new mobile
Delta DF130 portable
foam unit
Eugeniu Volociuc • Proved access to hard to
Head of HSE reach areas and better
efficiency
Emergency
Response Failure
70