Page 76 - Zero is Possible - Volume 3
P. 76

Rezina
           MOLDOVA  Cement  response
                         Emergency




                         The silent hero:

                         Tire(d) of fires?


                         Opportunity             Cost: 3 kCHF
                         Use of used tires required   (per foam unit)
                         specific fire protection   Timeline: 1 month
                         and emergency
                         preparation.            Results
                                                 •  Drills proved a good
                         Solution                 preparation and efficient
                         •  Limited storage capacity  dense and stable foam
       Stefan Birau      •  Two independent       blanket
          CEO             storage cells separated   •  After action reviews
                          by fire resistant walls  enabled improved
                         •  Dedicated track       response times
                           excavator to respond  •  Better asset protection
                         •  Fire drills performed by
                           the emergency response
                           team using a new mobile
                           Delta DF130 portable
                           foam unit
     Eugeniu Volociuc    •  Proved access to hard to
       Head of HSE         reach areas and better
                           efficiency




          Emergency
         Response Failure
    70