Page 86 - Zero is Possible - Volume 2
P. 86
Rashadiya Cement Plant
Pollution
JORDAN Cement From old to coal: A smart
storage transformation
Opportunity Results
Convert the old limestone • Complied with
storage into a coal hall, regulatory
meeting environmental environmental
and HSE standards. requirements
• Saving of 1.2 MCHF
Solution compared to the
• Transforming Line 2 construction of new
Samaan Samaan Limestone yard to Coal storage hall
CEO yard, cost of 184.5 kCHF • Improved ambient air
• Separating Line 2 with a quality in the working
partition wall area
• Installing fire fighting
and detection systems
per H&S risk assessment
• Leveling the storage floor
Raed Musa
Head of Environment
& Geocycle
Pollution
74