A RICA          Cartago Cement Plant
                           Contact with

                           Hot Meal
           COST  Cement    A clear route to safety!




                           Opportunity
                                                   Due to the design of
                           Lack of a safe escape   Results
                           route from potential    the preheating tower,
                           hot meal flushes at the   evacuation and rescue
                           preheater tower.        conditions were
                                                   challenging. Installing
                           Solution                a structure attached to
                           Installation of an      the preheating tower led
                           annex structure to      to an easier and faster
       Natalia Soler       the preheating tower    evacuation from any
          CEO              building to allow a safe   tower floor. Access to
                           and fast escape route   rescue in an accident
                           for personnel working   has also become more
                           in potential hot meal   straightforward.
                           flushing areas.




       Silena Oviedo
       Head of H&S