A RICA Cartago Cement Plant
Contact with
Hot Meal
COST Cement A clear route to safety!
Opportunity
Due to the design of
Lack of a safe escape Results
route from potential the preheating tower,
hot meal flushes at the evacuation and rescue
preheater tower. conditions were
challenging. Installing
Solution a structure attached to
Installation of an the preheating tower led
annex structure to to an easier and faster
Natalia Soler the preheating tower evacuation from any
CEO building to allow a safe tower floor. Access to
and fast escape route rescue in an accident
for personnel working has also become more
in potential hot meal straightforward.
flushing areas.
Silena Oviedo
Head of H&S
Contact with
Hot Meal