Page 26 - Kilcawley Construction Brochure
P. 26

Civils/Urban Regeneration Ballina Beverages, Ballina
Project Location
Value Description
Client
Design Team Engineer
Ballina, Co. Mayo
€ 1.6m
Construction of 2nr 2200m3 precast bulk water storage tanks, stainless steel process pipework, control building. Mechanicalandelectrical installation and extensive site works.
Works were carried out in a live environment with no disruption to production.
Ballina Beverages (Coca Cola) Tobin Consulting Engineers
Key Packages
•Bulk excavations (30,000m3) in rock. •Pre-cast concrete storage tanks. •Stainless steel process pipework. •Ductile iron pipework.
•Control building with ‘Forticrete’ facade.
Key Deliverables
•Working in a live production environment.
•Completing a tie in of services on a pre-scheduled shutdown.
•Integrated traffic management plan within operating facility.
•Dust suppression measures.