Page 35 - ASME JRC 2018 Program
P. 35
Author Index
AUTHOR LAST NAME AUTHOR FIRST NAME PAPER NUMBER PAPER TITLE SESSION DAY TIME ROOM
NUMBER
JONES ROBERT JRC2018-6214 DEFECT PROGNOSTICS MODELS FOR SPALL GROWTH IN RAILROAD BEARING ROLLING 2-3 THURSDAY, APRIL 19, 2018 10:00 AM - 12:00 PM CONFERENCE LEVEL,
KAPAHI ANIL JRC2018-6240 ELEMENTS
KAPAHI ANIL JRC2018-6241 EVALUATION OF STANDARD AND REAL FIRE EXPOSURES TO PREDICT THE TEMPERATURE CONFERENCE CENTER B
KAYMAKCI ABDULLAH JRC2018-6107 RESPONSE OF A RAILCAR FLOOR ASSEMBLY
MODELING THE THERMO-STRUCTURAL RESPONSE OF RAILCAR FLOOR ASSEMBLIES 6-1 WEDNESDAY, APRIL 18, 2018 01:15 PM - 03:30 PM CONFERENCE LEVEL, FRICK
DURING STANDARD FIRE RESISTANCE TESTS
EFFECTS OF WELD BUILD-UP ON THE MECHANICAL PROPERTIES OF RAILWAY WHEELS 6-1 WEDNESDAY, APRIL 18, 2018 01:15 PM - 03:30 PM CONFERENCE LEVEL, FRICK
2-1 WEDNESDAY, APRIL 18, 2018 03:45 PM - 06:00 PM CONFERENCE LEVEL,
CONFERENCE CENTER C
JRC2018-6108 THE EFFECT OF METAL TRANSFER MODES ON MECHANICAL PROPERTIES OF 3CR12 2-2 THURSDAY, APRIL 19, 2018 07:45 AM - 09:45 AM CONFERENCE LEVEL,
JRC2018-6276 STAINLESS STEEL
IS CBTC ENOUGH? CONFERENCE CENTER B
KEEVILL DAVE 3-1 WEDNESDAY, APRIL 18, 2018 01:15 PM - 03:30 PM CONFERENCE LEVEL,
CONFERENCE CENTER C
KEO DARIA JRC2018-6105 IMPROVED OVERHEAD CONTACT SYSTEM OPERATION WITH INCLINED PENDULUM 9-1 THURSDAY, APRIL 19, 2018 10:00 AM - 12:00 PM CONFERENCE LEVEL, OLIVER
JRC2018-6185 SUSPENSION
KERCHOF BRAD JRC2018-6180 INVESTIGATION OF BROKEN CUT SPIKES ON ELASTIC FASTENER TIE PLATES USING AN 1-4 WEDNESDAY, APRIL 18, 2018 03:45 PM - 06:00 PM CONFERENCE LEVEL,
INTEGRATED SIMULATION METHOD
RAILROAD R&D OVER THE 50 YEARS AND THE KEY EVENTS SURROUNDING IT CONFERENCE CENTER B
KESLER KEVIN 11-1 WEDNESDAY, APRIL 18, 2018 11:45 AM - 01:00 PM MEZZANINE LEVEL, BOB AND
DOLORES HOPE
KISS JAMES M. JRC2018-6175 CLASSIFICATION OF RAIL SWITCH DATA USING MACHINE LEARNING TECHNIQUES 4-2 THURSDAY, APRIL 19, 2018 01:30 PM - 03:30 PM CONFERENCE LEVEL, OLIVER
KOLA GERTI JRC2018-6105 IMPROVED OVERHEAD CONTACT SYSTEM OPERATION WITH INCLINED PENDULUM
SUSPENSION 9-1 THURSDAY, APRIL 19, 2018 10:00 AM - 12:00 PM CONFERENCE LEVEL, OLIVER
JRC2018-6142 PROVIDING CYBER SITUATIONAL AWARENESS FOR PTC USING A DISTRIBUTED IDS
KOLLI SATISH SYSTEM 3-3 THURSDAY, APRIL 19, 2018 01:30 PM - 03:30 PM CONFERENCE LEVEL,
JRC2018-6246 PREDICTING FLAMMABILITY OF RAILCAR INTERIOR FINISH WITH SMALL-SCALE HEAT
RELEASE RATE DATA CONFERENCE CENTER C
JRC2018-6208 A SAFETY RISK MODEL FOR US RAILROAD OPERATIONS
KRAFT STEFAN JRC2018-6170 EVALUATING OF TRACTION SUBSTATION CAPACITY USING HEADWAY SHIFT AND 6-1 WEDNESDAY, APRIL 18, 2018 01:15 PM - 03:30 PM CONFERENCE LEVEL, FRICK
PERTURBATION PARAMETERS
KRISHNAMACHARI SADAGOPA JRC2018-6273 DYNAMIC MODEL AND EXPERIMENTAL INVESTIGATION FOR VIBRATION RESPONSE OF 6-6 THURSDAY, APRIL 19, 2018 03:45 PM - 05:45 PM CONFERENCE LEVEL, FRICK
KU BIH-YUAN SUSPENSION SYSTEM OF INDIAN LOCOMOTIVE 9-1 THURSDAY, APRIL 19, 2018 10:00 AM - 12:00 PM CONFERENCE LEVEL, OLIVER
JRC2018-6175 CLASSIFICATION OF RAIL SWITCH DATA USING MACHINE LEARNING TECHNIQUES
KUMBHALKAR M. A. JRC2018-6167 PERFORMANCE-BASED SPECIFICATION FOR CONCRETE RAILROAD TIE FREEZE-THAW 10-2 THURSDAY, APRIL 19, 2018 10:00 AM - 12:00 PM CONFERENCE LEVEL, PHIPPS
DURABILITY
LAMOUREUX BENJAMIN JRC2018-6139 IMPROVED BEAMFORMING TECHNIQUES FOR ULTRASONIC RAIL DEFECT IMAGING 4-2 THURSDAY, APRIL 19, 2018 01:30 PM - 03:30 PM CONFERENCE LEVEL, OLIVER
LANGE DAVID JRC2018-6140 POTENTIAL FOR HIGH-SPEED RAIL INSPECTION BY PASSIVE-ONLY ULTRASONIC
MONITORING 1-1 WEDNESDAY, APRIL 18, 2018 01:15 PM - 03:30 PM CONFERENCE LEVEL,
JRC2018-6240 EVALUATION OF STANDARD AND REAL FIRE EXPOSURES TO PREDICT THE TEMPERATURE
RESPONSE OF A RAILCAR FLOOR ASSEMBLY CONFERENCE CENTER A
JRC2018-6241 MODELING THE THERMO-STRUCTURAL RESPONSE OF RAILCAR FLOOR ASSEMBLIES
LANZA DI SCALEA FRANCESCO DURING STANDARD FIRE RESISTANCE TESTS 6-6 THURSDAY, APRIL 19, 2018 03:45 PM - 05:45 PM CONFERENCE LEVEL, FRICK
JRC2018-6246 PREDICTING FLAMMABILITY OF RAILCAR INTERIOR FINISH WITH SMALL-SCALE HEAT
RELEASE RATE DATA 6-6 THURSDAY, APRIL 19, 2018 03:45 PM - 05:45 PM CONFERENCE LEVEL, FRICK
JRC2018-6251 INVESTIGATION OF THE EXPOSURE FROM A REALISTIC FIRE ON A RAILCAR FLOOR
LATTIMER BRIAN 6-1 WEDNESDAY, APRIL 18, 2018 01:15 PM - 03:30 PM CONFERENCE LEVEL, FRICK
6-1 WEDNESDAY, APRIL 18, 2018 01:15 PM - 03:30 PM CONFERENCE LEVEL, FRICK
6-1 WEDNESDAY, APRIL 18, 2018 01:15 PM - 03:30 PM CONFERENCE LEVEL, FRICK
JRC2018-6257 FIRE GROWTH IN STANDARD TESTS AND RAILCARS 6-7 THURSDAY, APRIL 19, 2018 03:45 PM - 05:45 PM CONFERENCE LEVEL,
6-7 THURSDAY, APRIL 19, 2018 03:45 PM - 05:45 PM CONFERENCE CENTER C
LAURY JOHN JRC2018-6247 TRANSIENT STABILITY OF ROTARY FREQUENCY CONVERTER FED LOW FREQUENCY 9-2 THURSDAY, APRIL 19, 2018 03:45 PM - 05:45 PM CONFERENCE LEVEL,
RAILWAY GRIDS: THE IMPACT OF DIFFERENT GRID IMPEDANCES AND DIFFERENT CONFERENCE CENTER C
JRC2018-6261 CONVERTER STATION CONFIGURATIONS CONFERENCE LEVEL, OLIVER
JRC2018-6258 USING NATURALISTIC DRIVING STUDY DATA TO INVESTIGATE DRIVER BEHAVIOR AT
LAUTALA PASI HIGHWAY-RAIL GRADE CROSSINGS 6-4 THURSDAY, APRIL 19, 2018 10:00 AM - 12:00 PM CONFERENCE LEVEL, FRICK
LI WEI BALLAST SUPPORT CONDITION AFFECTING CROSSTIE PERFORMANCE INVESTIGATED
THROUGH DISCRETE ELEMENT METHOD 1-6 THURSDAY, APRIL 19, 2018 10:00 AM - 12:00 PM CONFERENCE LEVEL,
CONFERENCE CENTER A
35