               9.3  SCREW COUPLING STOCK (ICF design + Garib Rath)




                                           FAC             ACCN   WLRRMDAC   WACCNH   SCN   GS/CZ    VP
                      Coach type                FACCW   ACCW                WCB                SLR          Total




                   Bare on trains        4     0   40  90      6    47     2    230  88  20        4     531

                   Spares required       1     0    1    2     1     1     1     3      2    1     1     14
                   Total  Required       5     0   41  92      7    48     3    233  90  51        5     575

                   Actual holdings       5     1   42  92      7    49     5    234  95  23       14     567


               9.4  Spares requirement as per Rly Bd. Lr.No.2019/E&R/2(12)/1 dated 23.06.2020.

                            Type                Maintenance spares             Traffic spares         Total
                   AC caches                             6%                         5%                 11%

                   Non- AC caches                        5%                         4%                 9%


               10. INFRASTRUCTURE  FOR  MAINTENANCE  OF  COACHING  TRAINS  AND    FREIGHT
                     STOCK:
               10.1  INFRASTRUCTURE FACILITIES FOR COACHING MAINTENANCE:

                                                         Pit lines
                         Depot           No. of Pit        Capacity in coach            Pt lighting facilities
                                           lines                 length
                                             3                     26                       Available
                                             2                     24                       Available
                          SC
                                             1                     23                       Available
                                             1                     17                     Not available
                                             3                     24                       Available
                                             2                     18                       Available
                          HYB
                                             1                     16                       Available
                                             1                     15                       Available
                          KZJ                2                     10                       Available
                         BDCR                1                     16                     Not available
                         KHNP                1                     24                       Available

               10.2  INFRASTRUCTURE FACILITIES FOR FREIGHT MAINTENANCE:


                                                        Yard examination facilities
                    Depot       No. of       Air brake           Welding                         Waist level
                                 lines     testing facility       facility       Pathway           lighting
                     RDM        4 lines      Available          Available        Available        Available

                      BPA       3 lines      Available          Available        Available        Available

                      SNF       4 lines      Available          Available        Available        Available

                      DKJ       1 line       Available          Available        Available        Available