Page 89 - CRS E-booklet 2022
P. 89
87
17.FORMATION WIDTH & SLOPE ADEQUACY:
SI DN / Length
No. Section UP From KM To KM (Km.) Remarks
BPQ - KZJ ECTION:
Formation Treatment
with blanketing
1 BPQ - KZJ DN 202.50 203.05 0.55 material along with
Geo-textile.
Formation Treatment
with blanketing
2 BPQ - KZJ DN 318.075 319.518 1.443 material along with
Geo-textile.
Note: 1. Work was sanctioned in PWP 2021-22.
2. Tender was called and LOA issued .
3. Work will be planned to execute in December, 2022.