                          17.FORMATION WIDTH & SLOPE ADEQUACY:






                           SI                  DN /                            Length
                          No.     Section       UP     From  KM      To KM      (Km.)         Remarks




                           BPQ - KZJ ECTION:


                                                                                        Formation Treatment
                                                                                        with blanketing
                           1     BPQ - KZJ      DN      202.50      203.05       0.55   material along with
                                                                                        Geo-textile.

                                                                                        Formation Treatment
                                                                                        with blanketing
                           2     BPQ - KZJ      DN      318.075     319.518     1.443   material along with
                                                                                        Geo-textile.


                          Note: 1. Work was sanctioned in PWP 2021-22.
                                 2. Tender was called and LOA issued .
                                 3. Work will be planned to execute in December, 2022.