Page 129 - CRS E-BOOKLET 2022
P. 129

127


               LINE  DIAGRAM  OF  DIVISION  INDICATING  ELECTRIFIED  &  NON-ELECTRIFIED
               SECTIONS






































                                            Fig. Line Diagram of TRD SC Division

               a) PERFORMANCE STATISTICS:


               ACTION PLAN:


                   Sl.                          Item in brief                          Target      Total
                  No.
                    1    Provision  of  Packing  saddles  in  Catenary  suspension      2500       1221
                         clamps

                    2    Replacement of over Aged insulators                           10127        549

                    3    Provision  of  160  sq.mm  jumper  wire  in  place  of  105    101         25
                         sq.mm jumper wire for all isolators on main line

                    4    Availability  of  sleeper  type  temporary  masts  2  each      38          0
                         per depot

                    5    Improving  Ah  battery  capacity  of  switching  stations       11          0
                         with more than 8 BM's/CB's

                    6    Replacement of locally manufactured dwarf mast guy              28          0
                         rods

                    7    Improvement  of  contact  wire  height  to  permit               6          0
                         passage of DSDC trains

                  8      Modification  of  LA  Disconnector  arrangement  from          419         415
   124   125   126   127   128   129   130   131   132   133   134