Page 14 - CRS E-BOOKLET 2022
P. 14
12
9.3 SCREW COUPLING STOCK (ICF design + Garib Rath)
FAC ACCN WLRRMDAC WACCNH SCN GS/CZ VP
Coach type FACCW ACCW WCB SLR Total
Bare on trains 4 0 40 90 6 47 2 230 88 20 4 531
Spares required 1 0 1 2 1 1 1 3 2 1 1 14
Total Required 5 0 41 92 7 48 3 233 90 51 5 575
Actual holdings 5 1 42 92 7 49 5 234 95 23 14 567
9.4 Spares requirement as per Rly Bd. Lr.No.2019/E&R/2(12)/1 dated 23.06.2020.
Type Maintenance spares Traffic spares Total
AC caches 6% 5% 11%
Non- AC caches 5% 4% 9%
10. INFRASTRUCTURE FOR MAINTENANCE OF COACHING TRAINS AND FREIGHT
STOCK:
10.1 INFRASTRUCTURE FACILITIES FOR COACHING MAINTENANCE:
Pit lines
Depot No. of Pit Capacity in coach Pt lighting facilities
lines length
3 26 Available
2 24 Available
SC
1 23 Available
1 17 Not available
3 24 Available
2 18 Available
HYB
1 16 Available
1 15 Available
KZJ 2 10 Available
BDCR 1 16 Not available
KHNP 1 24 Available
10.2 INFRASTRUCTURE FACILITIES FOR FREIGHT MAINTENANCE:
Yard examination facilities
Depot No. of Air brake Welding Waist level
lines testing facility facility Pathway lighting
RDM 4 lines Available Available Available Available
BPA 3 lines Available Available Available Available
SNF 4 lines Available Available Available Available
DKJ 1 line Available Available Available Available