Page 181 - CRS E-BOOKLET 2022
P. 181
NO. OF ADMINISTRATIV NO. OF POSTS
SL. DEPART POSTS E APPROVAL APPROVED BY FINAL SANCTION BY GM REMARKS
NO MENT SECTION
PROPOSED BY DRM/SC FA&CAO
RDM, BPA
Goods Cabins & RDM
20 OPTG. Bye- pass cabin(3 Balance 16 posts
cabins) 16 16 0
TLPR-RCPM & MLY -C -
21 S&T 57 52 0 With PCPO/SC as on 16.07.2021
CHZ- GT Sec
RGPM-MMZ
(RGPM,RDM PPZ,MCI With PCPO vide lr.dt.22.02.2017 for obtaining
22 S&T 23 17 - -
&MMZ) in KZJ-BPQ FA&CAO's concurrence
section
New BG line between
JPTN to MACU for the Proposal with PCPO vide lr dt.21.05.2012. Vide
23 S&T 20 20 - - CSTE's lr.dt.06.07.2012 posts certified are JE/S-1,
stations JPTN,RRPM &
MACU ESM.III,08, Khasali-8,TCM.III-1 Totaling to 18 posts.
Mattampalli-
Janapahad
(Mattampalli,
Raghapuram,
24 S&T 26 22 - - With PCPO vide lr dt.22.02.2017
Janapahad &
Vishnupuram
(addl)
New BG Non electrified
Single Line Between
PDPL-NZB (for the
stations Korutla,
Metpally, Mortad Out of 53 posts - 24 posts i.e SSE-01, ESM-III-07,
&Armoor). SSE/T-01, JE/T-01, TCM.III-05,,Khalasis-09 have
25 S&T New BG Non electrified 53 53 - - been sanctioned, however, as the section is an
important section, the remaining Technical
Single Line Between posts i.e SSE/S-02, ESM-II-08, JE/T-02, TCM-III-05,
PDPL-NZB (for the
stations Gangadhara, Khalasis-10, B/S -01, H/M-01 may also be got
Lingampet, Jagityal, sanctioned please. File with Sr.DPO/SC
Podur and Mallial
Nukapalli
179