First quarter review 2022 (continued)




















                 • PARKING REFURBISHMENT:                                                                      • VMC:

                 •   The complete repair of the car park requires the complete                                 •    Replacement of individual VMC extractors, an inventory has been

                     replacement of the EP/EU network, the expertise by robot-camera of                             carried out, a process with suppliers is in progress.
                     the EP/EU pipes has shown that they were out of order! (crushing,
                                                                                                               •    LOCAL SKI DOOR:
                     major deformations, ruptures), The condition of the water drainage

                     pipe from the stream passing under the garages and its connection                         •    The door was installed, an opening lock and a bottom door protection
                     from the sump under the terrace to the sump located in front of the                            were installed at the beginning of October.
                     garages remains to be assessed. The corresponding quotes will be

                     drawn up on the basis of this expertise. Asphalt can only be                              •    CHARMOZ STAIRCASE:
                     considered after "settling" of the stabilizing embankments of the
                                                                                                               •    The steps must be patched, this staircase is subject to extreme
                     conduits, thus avoiding any cracking in the medium and long term.
                                                                                                                    thermal conditions!

                 •   BALCONIES:                                                                                •    ELIMINATION OF EASE OF PASSAGE:


                 •   The repair work on the balconies was undertaken in November 2021.                         •    The surveyor's report will allow us to finalize and propose to Mr.
                                                                                                                    LEFOULON a participatory financial schedule for snow removal and
                 •   CHARMOZ PANELS AND DOMES:
                                                                                                                    maintenance of the access road to his property.
                 •   Their installation was carried out in January