His Highness was on a visit to the Ruler of Umm Al
                     Quwain and knew that work in constructing the
                     hospital was suspended for 4 years




            tion was not completed and that the
            Ministry of Health did not complete it,
            despite the fact that four years have
            passed since its establishment! Thus,
            HH dispatched HH Sheikh Hamdan
            bin Rashid to complete and equip
            the hospital at Sheikh Rashid’s own
            expense.


               In this regard, HH Sheikh Ham-
            dan Bin Rashid talks to us, saying:
               We started work to achieve what
            HH Sheikh Rashid wanted.  We in-
            structed Dr. Juma Belhoul, Director
            General of the Department of Health
            and Medical Services who headed of a
            group of experts and doctors in a vis-
            it to see the hospital. Dr. Juma found                            Rashid meeting Ahmed Al Mualla
            that the hospital needed some adjust-
            ments and, on this basis, we agreed
            to bring the things required from the   the equipment will be installed two   After examining the blueprints
            MOH                           months  later,  so  the hospital will be   of the hospital, Dr. Juma Belhoul
               HH Sheikh Hamdan adds: what we   operational before the end of the year.  discovered many mistakes. In this
            care about is the high level of health   When  we asked  His Highness,   regard he says:
            services for our citizens.    who will bear the hospital expenses?!   For example, the doors of the op-
               It is expected that the buildings   He answered: All the expenditure is   erating room were so narrow that we
            and roads in the hospital will be   funded by Sheikh Rashid’s own mon-  could not bring the necessary equip-
            completed  within  six  months,  and   ey with open budget.  ment into the room, so we had to de-
                                                                         molish and expand them.
                                                                           The absence of a fence exposed
                                                                         the hospital to damage, bringing the
                                                                         renovation cost up to ten percent of
                                                                         the total costs. In addition to the ab-
                                                                         sence of a kitchen, a water tank, an
                                                                         electrical complex or phones.  We’ve
                                                                         developed a detailed work plan to
                                                                         make the hospital operational as soon
            Hamdan bin Rashid talking about Umm   Rashid Al Mualla talking to Akhbar Dubai  as possible.  This will cost around 6
            Al Quwain Hospital                                           million dirhams.  We proceeded with