dubai, u.a.e. october 2006                                      Jumeirah Village - towers Development Code               27

Figure 9.02,	                                       Section 9.03.	 Concept Plan                                         D.	The Development Code Administrator reserves the right        Figure 9.03,	                                            administration and procedures
Pre-Application Review Process                                                                                               to approve a Concept Plan with conditions, assuming        Concept Plan Review Process
                                                    9.03.01.	 Submission of Materials                                        that such conditions serve to bring the project into
Pre-Application                 Development Intent  The applicant shall submit to Jumeirah Village LLC two sets of           compliance with this Code.                                 Pre-Application                  Concept Plan
 Meeting Stage                  Application         all design materials required in the Application Checklists as                                                                       Meeting Stage                   Application and
                                Submitted           well as the Concept Plan Application.                               E.	If approval is conditional, the applicant may request a                                       Materials Submitted
                                                                                                                             meeting with the Development Code Administrator to            Concept Plan
                                Review for          A.	Generally, the Concept Plan shall conceptually show to                discuss the conditions and request reconsideration.                      Stage              Review for
                                Completeness             scale property boundaries, approximate location and                 Following further review, the Development Code                                              Completeness
                                                         dimensions of all structures, setbacks, location and                Administrator shall notify the applicant of revisions, if         (Optional)
Concept Plan        Yes         Pre-Application          general information regarding signs, parking areas,                 any, to the final action.
          Stage                 Meeting Conducted        entryways, topography, north orientation, a description of                                                                              Site Plan
                                                         general bulk requirements, landscaping and schematic           9.03.03.	 Time                                                                Stage
    (Optional)                  Is a Concept Plan        floor plans, and elevations of at least three sides of         A.	The Development Code Administrator shall approve or
                                Needed?                  all structures. Specific requirements are provided in                                                                          Building Permit
                                                         Application Checklists.                                             deny a Concept Plan within 10 working days of receipt                    Stage              Application Review
                                                                                                                             of the application and determination of completeness.
Site Plan                                           B.	An additional CAD file of the Concept Plan may be                     Notification of approval or denial shall be made within                                                        Yes
    Stage                                                submitted as a supplement to required materials. If                 5 working days of final action, for a total of 15 working                                   Is More Information
                                                         submitted, the CAD file should be in a format that is               days.                                                                                       Needed?
                    No                                   acceptable to Jumeirah Village LLC, including file format,
                                                         separation of design elements into layers, and clean line      B.	Upon approval, the applicant shall have no more than                                             No
                                                         work.                                                               3 months to submit a Site Plan application. Following 3
Building Permit                                                                                                              months, a Concept Plan shall be considered expired. An                                         Is the Application
             Stage                                  C.	A spreadsheet summary of all development data, in                     extension of time may be granted by Jumeirah Village                            Yes Approved?
                                                         compliance with the requirements of this Code (such as              LLC upon request.
                                                         lot area, built up area and parking provision).                                                                                                                 No
                                                                                                                        C.	If approval is conditional, the applicant shall be deemed
                                                    9.03.02.	 Plan Review Process                                            to have agreed with all conditions unless, within 15                            Yes with
                                                    A.	The approval process shall follow the steps highlighted in            working days, the applicant requests a meeting with the                         Conditions
                                                                                                                             Development Code Administrator to review the decision.
                                                         Figure 9.03, Concept Plan Review Process and discussed                                                                                                          Letter of
                                                         throughout Section 9, Administration and Procedures.           D.	Within 15 working days of meeting the applicant to                                            Rejection
                                                                                                                             discuss the conditional approval, the Development Code
                                                    B.	The Development Code Administrator shall review the                   Administrator shall notify the applicant of revisions, if
                                                         application in its ability to meet the vision of the Jumeirah       any, to the final action.
                                                         Village Master Plan and the requirements of this Code.
                                                         If all requirements are met, the Development Code              Section 9.04.	 Site Plan
                                                         Administrator shall approve the application. If additional
                                                         information is needed, the Administrator shall request         9.04.01.	 Submission of Materials
                                                         additional information.                                        A.	The applicant shall submit to Jumeirah Village LLC

                                                    C.	The Development Code Administrator shall notify the                   two sets of all design materials required in Application
                                                         applicant of final action, including approval or denial of          Checklists as well as the Site Plan Application.
                                                         the application. One set of the plans marked as approved
                                                         or denied shall be accompanied by a letter and returned        B.	Generally, the Site Plan shall accurately show to scale
                                                         to the applicant while the second set shall be similarly            property boundaries, location and dimensions of all
                                                         marked and retained by Jumeirah Village LLC.                        structures, all building wall elevations and setbacks,
                                                                                                                             parking areas, entryways, topography, north orientation,