dubai, u.a.e. october 2006 Jumeirah Village - towers Development Code 27
Figure 9.02, Section 9.03. Concept Plan D. The Development Code Administrator reserves the right Figure 9.03, administration and procedures
Pre-Application Review Process to approve a Concept Plan with conditions, assuming Concept Plan Review Process
9.03.01. Submission of Materials that such conditions serve to bring the project into
Pre-Application Development Intent The applicant shall submit to Jumeirah Village LLC two sets of compliance with this Code. Pre-Application Concept Plan
Meeting Stage Application all design materials required in the Application Checklists as Meeting Stage Application and
Submitted well as the Concept Plan Application. E. If approval is conditional, the applicant may request a Materials Submitted
meeting with the Development Code Administrator to Concept Plan
Review for A. Generally, the Concept Plan shall conceptually show to discuss the conditions and request reconsideration. Stage Review for
Completeness scale property boundaries, approximate location and Following further review, the Development Code Completeness
dimensions of all structures, setbacks, location and Administrator shall notify the applicant of revisions, if (Optional)
Concept Plan Yes Pre-Application general information regarding signs, parking areas, any, to the final action.
Stage Meeting Conducted entryways, topography, north orientation, a description of Site Plan
general bulk requirements, landscaping and schematic 9.03.03. Time Stage
(Optional) Is a Concept Plan floor plans, and elevations of at least three sides of A. The Development Code Administrator shall approve or
Needed? all structures. Specific requirements are provided in Building Permit
Application Checklists. deny a Concept Plan within 10 working days of receipt Stage Application Review
of the application and determination of completeness.
Site Plan B. An additional CAD file of the Concept Plan may be Notification of approval or denial shall be made within Yes
Stage submitted as a supplement to required materials. If 5 working days of final action, for a total of 15 working Is More Information
submitted, the CAD file should be in a format that is days. Needed?
No acceptable to Jumeirah Village LLC, including file format,
separation of design elements into layers, and clean line B. Upon approval, the applicant shall have no more than No
work. 3 months to submit a Site Plan application. Following 3
Building Permit months, a Concept Plan shall be considered expired. An Is the Application
Stage C. A spreadsheet summary of all development data, in extension of time may be granted by Jumeirah Village Yes Approved?
compliance with the requirements of this Code (such as LLC upon request.
lot area, built up area and parking provision). No
C. If approval is conditional, the applicant shall be deemed
9.03.02. Plan Review Process to have agreed with all conditions unless, within 15 Yes with
A. The approval process shall follow the steps highlighted in working days, the applicant requests a meeting with the Conditions
Development Code Administrator to review the decision.
Figure 9.03, Concept Plan Review Process and discussed Letter of
throughout Section 9, Administration and Procedures. D. Within 15 working days of meeting the applicant to Rejection
discuss the conditional approval, the Development Code
B. The Development Code Administrator shall review the Administrator shall notify the applicant of revisions, if
application in its ability to meet the vision of the Jumeirah any, to the final action.
Village Master Plan and the requirements of this Code.
If all requirements are met, the Development Code Section 9.04. Site Plan
Administrator shall approve the application. If additional
information is needed, the Administrator shall request 9.04.01. Submission of Materials
additional information. A. The applicant shall submit to Jumeirah Village LLC
C. The Development Code Administrator shall notify the two sets of all design materials required in Application
applicant of final action, including approval or denial of Checklists as well as the Site Plan Application.
the application. One set of the plans marked as approved
or denied shall be accompanied by a letter and returned B. Generally, the Site Plan shall accurately show to scale
to the applicant while the second set shall be similarly property boundaries, location and dimensions of all
marked and retained by Jumeirah Village LLC. structures, all building wall elevations and setbacks,
parking areas, entryways, topography, north orientation,