dubai, u.a.e. october 2006  Jumeirah Village - towers Development Code  39

o 	 Detailed Master Landscaped Plan (scale of 1:100)                                                                                                                                                                                                                                                         application checklists
     o	 Plan Title, Scale, North Arrow, Project Name, Address of Site, Applicant Name, Date
     o	 Calculations of required landscaping and fencing
     o	 Schedule of plants and materials to be incorporated into the project including name, quantity and reference to the
          Landscape Master Plan
     o	 Site plan and section detail of location of landscape treatments, including trees, shrubs, ground cover and lawns
     o	 Location and section detail of hard surface materials, water features and fencing to be located on the project site

o 	 Irrigation Calculations
     o	 Irrigation water demand calculations relating to the proposed plantings shown and described in the Landscape Master
          Plan, including the peak daily plant water consumption as indicated in liters and calculated at the peak season of July
     o	 Monthly projected irrigation water consumption figures covering the effect of leaching and other off-season practices
     o	 Irrigation site plan (scale of 1:200) indicating the location and capacity of the irrigation water storage tanks, tank
          connections, and details of the distribution system.
     o	 A timetable for timing in relationship to irrigation of landscaping at maturity

o 	 Utility Plan (scale of 1:200)
     Schedule and plan indicating coordinates, depths, levels, and sizes of all pipes, conduits and connections regarding
     water (potable and for irrigation), wastewater, electricity, telephone, and other utilities from points of entering the site to
     distribution including, if required, transformers, switch boxes, meters and emergency generator.

o 	 Electricity Calculations and Diagrams
     o	 Final electricity load calculations for the development expressed in kVA
     o	 Detailed electrical diagrams indicating details of distribution and circuit breakers

o 	 Refuse Plan
     Calculation of anticipated refuse to be accumulated as well as provisions made for storage and disposal

o 	 Construction Schedule
     o	 Proposed time schedule for completion of the project as initiated upon receiving an approved Building Permit
     o	 Management plan describing the organization of work to be completed on the project in coordination with the provided
          time schedule, including plans for onsite supervisory personnel