Page 57 - be'ah_Annual report 2019-Final2_Neat
P. 57
Manifest flow
Waste generator goes to be’ah website Manifest reviewed by be’ah waste evaluator
www.beah.om, then clicks on the Hazardous be’ah waste evaluator. contacts Waste Generator to
Waste Services and registers. Afterwards, waste get info or to request sample
manifest is filled with required information before accepting the waste.
and registers as Waste Generator.
Additional
information needed?
yes
no
Waste sample
Waste goes
for treatment. analysed and
accepted.
Waste accepted, then a
Point where be’ah quotation is sent to WG.
takes ownership WG signs three copies of the
of the waste. manifest before transporting
the waste (The signed manifest
by the WG is considered as an
economical bidding signature.)
WG pays the final bill.
Waste is received, documentation The signed manifest shall
checked, weighed and sampled be handed over by the
at be’ah IWFT. Final signature of transporter and carried out
be’ah IWFT will be applied on through by the transporter.
the manifest and copies shall be
retained for 5 years by all parties.
57