Page 314 - GM E-Booklet Dec-2022
P. 314
STATION: DTP KMS: 103.12 Category : NSG-6
I. STAFF STRENGTH II.(a).BUILDING-RESIDENTIAL
Group C/D Available Staff Strength
Type I II III IV Total
Group C 2
Group D 2 Available - - - - -
Total 4
III. WATER SUPPLY ARRANGEMENTS II.(b).BUILDING- SERVICE
Total Demand (Lts) 2000 Station Building 1
i. Domestic (Lts) - Relay Room -
ii. Service Building (Lts) 2000 -
IV.PASSENGER AMENITIES
2nd Class 20
1.Waiting Hall (in Sqm) 6. Taps 5
1st Class -
PF. No.1 60
2.Platform Shelter(in Sqm) 7.Lavatories/Urinals 3/1
PF. No.2 50
PF. No.1 420
3.Platform Length (in Meters) 8. ShadyTrees 13
PF. No.2 420
4. Seats No's 28 9. Foot Over Bridge -
5. Vending Stall No's - - -
V.PASSENGER DETAILS
i. Number of Passengers dealt per day (Nos.) 12
ii. Average Earnings of the station per day (Rs. In Lakhs) 0.003
2021-22 2022-23
VI. EARNINGS OF THE STATION 2020-21 2021-22
(Upto Nov'21) (Upto Nov'22)
1. Passengers 0 3965 1465 83345
2. Parcels - - - -
3. Goods - - - -
VII. LOADING/UNLOADING
2021-22 2022-23
A.Loading -Outward 2020-21 2021-22
(Upto Nov'21) (Upto Nov'22)
No.Of Wagons 0 0 0 0
Tonnage 0 0 0 0
Commodity - - - -
2021-22 2022-23
B. Unloading - Inward 2020-21 2021-22
(Upto Nov'21) (Upto Nov'22)
No.Of Wagons 0 0 0 0
Tonnage 0 0 0 0
Commodity - - - -